Oberizon Construction
Reception and waiting area at The Shine Dental, White Rock, BC

New Westminster Construction

Pharmacy Construction in New Westminster, BC

A pharmacy is a security and compounding problem wrapped inside a retail fit-out. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near New Westminster runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in New Westminster.

Oberizon works across the Lower Mainland, including New Westminster's historic and high-density commercial areas. Every project is planned around site access, inspection windows and how the finished space has to run.

New Westminster work is shaped by older building conditions, healthcare tenancy. We use that to set scope and sequence before demolition starts.

UptownDowntownSappertonQueensborough

2026 range

$180–$250 per sq ft

turnkey — typically $270k–$375k for a 1,500 sq ft space

What that covers

  • Retail, dispensing, storage, and staff-area planning
  • Millwork, services, accessibility, and security coordination
  • Construction sequence and launch handover

What decides this build

A pharmacy is a secure area wrapped in a retail space. The dispensary boundary, sightlines and controlled-substance storage are fixed early, because they dictate where every wall can go.

The dispensary is laid out for sightlines and separation first — counter, consultation area and secure storage — and the millwork follows that. Where compounding is planned, the room is built to the USP 795 or USP 797 standard that applies, which cannot be retrofitted into a finished space.

Project review

We walk the space and price the risk before you commit to pharmacy construction. Permits and services are the two that bite.

Dispensary boundary

Sightlines, counter and secure storage are set first. Every other wall on the plan follows from them.

Compounding standard

Where compounding is planned the room is built to the applicable USP 795 or USP 797 requirements from drawing stage.

Questions

Frequently asked.

Does Oberizon handle pharmacy construction in New Westminster?

Yes. We run pharmacy construction across the Lower Mainland from our White Rock head office, and that includes New Westminster's historic and high-density commercial areas. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for pharmacy construction in New Westminster?

New Westminster issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.

How much does pharmacy construction cost in New Westminster?

$180–$250 per sq ft turnkey — typically $270k–$375k for a 1,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near New Westminster does Oberizon serve for pharmacy construction?

Most conversations start around Uptown, Downtown, and Sapperton. We travel further when the scope justifies it.

What should I prepare before starting pharmacy construction in New Westminster?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

What has to be settled first in a pharmacy fit-out?

The dispensary boundary, sightlines and secure storage. Those decide where walls can go and where the millwork lands, so they are fixed before layout rather than adjusted around a finished plan.

What changes if the pharmacy will compound?

Compounding brings the applicable USP 795 or USP 797 requirements into the build — a dedicated room with its own ventilation and finishes. It cannot be retrofitted into a completed space, so it is decided before drawings.

Can Oberizon review my New Westminster space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning pharmacy construction in New Westminster?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770