Oberizon Construction
Reception desk and timber slat wall at a completed family dentist clinic

Surrey Construction

Tenant Improvement Contractor in Surrey

Oberizon Construction is a tenant improvement contractor in Surrey, working from a White Rock office. Surrey publishes three tenant-improvement streams. Two clinics are in progress in the city. A pharmacy on 156 Street is 1,500 sq ft. Flamingo Dental Clinic in Whalley is a dental fit-out. Neither is a general office renovation.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Surrey runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered near Surrey.

PharmacyIn progress

156 St pharmacy

156 Street, Surrey, BC

Specialty
Pharmacy
Size
1,500 sq ft
City permit authority
City of Surrey — Building Division
  • 1,500 sq ft pharmacy tenant improvement
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Flooring, lighting and washrooms
  • In progress on 156 Street
Dental clinicIn progress

Flamingo Dental Clinic

Unit 111, 10767 Whalley Boulevard, Surrey, BC

Specialty
Dental clinic
Size
1,158 sq ft
City permit authority
City of Surrey — Building Division
  • 1,158 sq ft dental fit-out in Whalley, Surrey
  • Three operatories
  • One future operatory roughed in at a consult room
Read the case study

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Surrey.

Surrey is the only municipality here that publishes a separate Medical Clinic Tenant Improvement permit, with its own three-week target. A clinic fit-out is not queued behind general commercial work. Fraser Health approval is required before the permit is issued where the space involves food handling, personal services or recreational services.

Surrey's commercial activity spreads across several distinct centres rather than one downtown — City Centre around Whalley and King George, Guildford, Fleetwood and Newton each carry their own professional and retail tenancy. Much of the healthcare space is in newer mixed-use and strata buildings, which usually means better base-building services than the older Fraser Valley stock but tighter strata rules about noise, hours and shared systems. The city has been adding population faster than almost anywhere in the province, and clinic demand has followed it into the suburban centres rather than staying downtown.

City CentreGuildfordFleetwoodNewton

2026 range

The commercial renovation band is the pointer: $95–$180 per sq ft

turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.

What that covers

  • Landlord drawing approval before the permit application
  • Base-building service checks before pricing
  • Construction sequenced to the city's tenant-improvement route

What decides this build

The landlord signs the drawings before the city sees them. Base-building power and make-up air are checked before the price is fixed.

We verify electrical capacity and make-up air before pricing. A shortfall found after demolition is what turns a tenant improvement into a change order.

Project review

We walk the space and price the risk before you commit to tenant improvement contractor. Permits and services are the two that bite.

Managed execution

One team holds the trades, the inspections and the deficiency list. You get one number to call.

Business operation

Reception, storage and customer flow are set against your opening date. The build is sequenced to protect it.

Work in progress in Surrey

Flamingo Dental Clinic is a dental tenant improvement at Unit 111, 10767 Whalley Boulevard. It is 1,158 sq ft. The room program is three operatories plus one future operatory roughed in at a consult room. It is in progress. It is a dental clinic. The dental page is the one that describes it.

A pharmacy tenant improvement on 156 Street is also in progress. It is 1,500 sq ft. Planning, the building permit, millwork, plumbing, electrical and mechanical are in the scope. It is a pharmacy. It is not an office fit-out and it is not a physiotherapy clinic.

Surrey's published streams

The City of Surrey Building Division splits tenant improvements into minor, new and medical clinic. The published targets are 3 business days for a minor tenant improvement, 3 weeks for a medical clinic tenant improvement and 10 weeks for a new tenant improvement. The clock starts on a complete application. A dental clinic confirms its own stream with the city. We do not file a dental suite as the medical stream by default.

The commercial renovation band of $95–$180 per sq ft is the pointer for a non-clinical interior. Clinic pages publish their own bands. None of those figures is a Surrey quote.

Questions

Frequently asked.

Are you a tenant improvement contractor in Surrey?

Yes. Oberizon Construction runs tenant improvements in Surrey from a White Rock office. Flamingo Dental Clinic on Whalley Boulevard and a pharmacy on 156 Street are in progress. Call (604) 385-3770.

How long does Surrey take to review a tenant improvement?

Surrey publishes 3 business days for a minor tenant improvement, 3 weeks for a medical clinic tenant improvement and 10 weeks for a new tenant improvement. The clock starts when the application is complete.

Does Oberizon handle tenant improvement contractor in Surrey?

Yes — we have 2 projects in progress in Surrey right now, including 156 St pharmacy. We run tenant improvement contractor across the Lower Mainland from a White Rock head office.

Who issues the building permit for tenant improvement contractor in Surrey?

The building permit is issued by City of Surrey — Building Division, reviewed against the BC Building Code and the city's own zoning. Surrey runs tenant improvements as their own permit stream and splits it three ways: minor, new and medical clinic. Review typically runs 3 business days for a minor tenant improvement and 3 weeks for a medical clinic fit-out against the city's own published targets.

How much does a tenant improvement cost in Surrey?

The commercial renovation band is the pointer: $95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Surrey does Oberizon serve for tenant improvement contractor?

Most conversations start around City Centre, Guildford, and Fleetwood. We travel further when the scope justifies it.

What should I prepare before starting tenant improvement contractor in Surrey?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can Oberizon review my Surrey space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a tenant improvement in Surrey?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770