Oberizon Construction
Reception and waiting area at the Marshall Road dental clinic, Abbotsford, BC

Langley Construction

Tenant Improvement Contractor in Langley

Oberizon Construction is a tenant improvement contractor in Langley, working from a White Rock office. Langley is two municipalities. The address decides who reviews the permit. Two dental clinics are in progress at #B115 and #E100, 8100 272 Street. Dentists in Aldergrove at Unit 115 is a completed dental clinic in the Township.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Langley runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered near Langley.

Dental clinicIn progress

272 St dental clinic (B115)

#B115-8100 272 St, Langley, BC

Specialty
Dental clinic
City permit authority
Township of Langley Permit, Licence and Inspection Services (City of Langley Development Services for City addresses)
  • Dental clinic in progress at #B115-8100 272 Street, Langley
Dental clinicIn progress

272 St dental clinic (E100)

#E100-8100 272 St, Langley, BC

Specialty
Dental clinic
City permit authority
Township of Langley Permit, Licence and Inspection Services (City of Langley Development Services for City addresses)
  • Dental clinic in progress at #E100-8100 272 Street, Langley

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Langley.

Langley is two municipalities. The Township of Langley and the City of Langley permit independently and publish their own tenant improvement guides, and the Township additionally runs a Tenant Improvement X-Press service to expedite eligible interior work. Which authority reviews the drawings is decided by the address, not by the mailing city.

Langley's professional space has followed its residential growth outward, so much of the newer clinic and office tenancy sits in Willoughby and along the 200 Street corridor rather than in the older City core. A lot of it is recent construction in mixed-use or standalone commercial buildings, which generally means adequate base-building services and fewer structural surprises than the older municipalities. Walnut Grove, Murrayville and Brookswood carry smaller neighbourhood practices. The market skews toward family healthcare — dental, medical and pharmacy — tracking the young families that have driven the area's growth.

WilloughbyWalnut GroveMurrayvilleBrookswood

2026 range

The commercial renovation band is the pointer: $95–$180 per sq ft

turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.

What that covers

  • Landlord drawing approval before the permit application
  • Base-building service checks before pricing
  • Construction sequenced to the city's tenant-improvement route

What decides this build

The landlord signs the drawings before the city sees them. Base-building power and make-up air are checked before the price is fixed.

We verify electrical capacity and make-up air before pricing. A shortfall found after demolition is what turns a tenant improvement into a change order.

Project review

We walk the space and price the risk before you commit to tenant improvement contractor. Permits and services are the two that bite.

Managed execution

One team holds the trades, the inspections and the deficiency list. You get one number to call.

Business operation

Reception, storage and customer flow are set against your opening date. The build is sequenced to protect it.

Which Langley reviews the drawings

The Township of Langley and the City of Langley permit independently. The Township runs a Tenant Improvement X-Press stream for eligible interior projects. The City of Langley publishes its own tenant improvement package. Neither publishes a review window we will quote. We confirm the current route from the civic address.

The commercial renovation band of $95–$180 per sq ft is the pointer for a non-clinical interior. It is not a Langley price. Newer buildings in Willoughby and along 200 Street usually mean fewer structural surprises than older stock.

Clinic tenant improvements we can name

Two dental clinics are in progress at #B115 and #E100, 8100 272 Street. They are new dental construction. Dentists in Aldergrove at Unit 115 was completed in June 2026. It includes a corridor of frosted-glass operatories, a CBCT and X-ray room, sterilization and lab millwork, staff workstations and a reception. Those are dental clinics. They are not office renovations.

Questions

Frequently asked.

Are you a tenant improvement contractor in Langley?

Yes. Oberizon Construction runs tenant improvements in Langley from a White Rock office. The Township and the City of Langley each issue their own permit. Call (604) 385-3770.

Who permits a Langley tenant improvement?

The civic address decides. Township of Langley Permit, Licence and Inspection Services reviews Township addresses. City of Langley Development Services reviews City addresses.

Does Oberizon handle tenant improvement contractor in Langley?

Yes — we have 2 projects in progress in Langley right now, including 272 St dental clinic (B115). We run tenant improvement contractor across the Lower Mainland from a White Rock head office.

Who issues the building permit for tenant improvement contractor in Langley?

The building permit is issued by Township of Langley Permit, Licence and Inspection Services (City of Langley Development Services for City addresses), reviewed against the BC Building Code and the city's own zoning. Tenant Improvement application, with a Tenant Improvement X-Press stream in the Township for eligible interior projects We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does a tenant improvement cost in Langley?

The commercial renovation band is the pointer: $95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Langley does Oberizon serve for tenant improvement contractor?

Most conversations start around Willoughby, Walnut Grove, and Murrayville. We travel further when the scope justifies it.

What should I prepare before starting tenant improvement contractor in Langley?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can Oberizon review my Langley space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a tenant improvement in Langley?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770