
North Vancouver, BC
General Contractors in North Vancouver, BC
The North Shore answers to Vancouver Coastal Health, not Fraser Health. Every other city on this site sits in the Fraser Health region, so a consultant who works the south side arrives with the wrong approval sequence. North Vancouver is also two municipalities, and each reviews its own drawings.
- Building since 2021
- Licensed & fully insured
- 35+ delivered projects
The North Shore is served from the White Rock office, to the same standards as the clinics and offices we build across the region.
Experience
The same team, every build.
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near North Vancouver runs through the same four stages.
- Building since 2021
- 5+yearsBuilding since 2021
- Plus 5 in progress
- 35+deliveredPlus 5 in progress
- Fastest clinic, five operatories
- 90daysFastest clinic, five operatories
- 01
Review
We walk the space and price the risk before you commit to anything.
- 02
Plan
Drawings and permits go in while equipment and long-lead items are ordered.
- 03
Build
One site lead holds the trades and calls you with progress every week.
- 04
Handover
Inspections cleared and the deficiency list closed before you take the keys.
Permits
Building in North Vancouver.
The District of North Vancouver requires an architect for most tenant improvements under the Architects Act, exempting only work that is purely mechanical, electrical or structural. It also points applicants at Bylaw 8271 sections 12.28 to 12.34 before they design anything, because a change of use or a significant alteration can require the entire building to be sprinklered rather than just the suite.
The practical effect is that a childcare, food or personal service use needs Vancouver Coastal Health sign-off in hand before the building permit application is made. Sequencing it afterwards stalls the application rather than the construction, and a sprinkler trigger found at plan check is a mechanical scope nobody budgeted.
- Permit authority
- City of North Vancouver Planning & Development, or the District of North Vancouver Building Department
- Commercial route
- Both North Vancouver municipalities run Commercial Tenant Improvement as its own building permit type, and the address decides which of the two reviews the drawings.
Reviews
What clinic owners say.
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
The market here
What North Vancouver is like to build in.
North Vancouver's commercial space runs along Lonsdale from the waterfront up through Central Lonsdale, with Edgemont and Lynn Valley carrying smaller neighbourhood tenancy. The Lower Lonsdale redevelopment has added newer podium commercial space, while Central Lonsdale professional buildings house much of the medical and dental practice. Finish expectations run high across the North Shore, and site access is genuinely tighter than in the suburbs — narrow lots, steep grades and limited staging area are normal rather than exceptional.
2026 commercial range
$120–$220 per sq ft
The same band applies in every city we work in. What changes is why a job sits high or low inside it.
Why North Vancouver sits where it does
North Vancouver prices at the top of the band and the reason is access rather than trades. Two bridges gate every delivery and inspection, and North Shore lots are steep and short of staging room. An architect required by statute on most tenant improvements is a real line in the soft costs too.
Where to go next
Also built in North Vancouver.
Guides
Before you start in this city.
Permit routes, costs and the questions worth asking a contractor before you shortlist one in North Vancouver.
Choosing a Contractor
10 questions for a healthcare contractor
The ten questions to ask a healthcare construction contractor in BC before you shortlist, what a good answer sounds like, and how to compare bids that priced different scopes.
11 min read
Permits & Compliance
Commercial renovation permits in BC
The permits a commercial renovation needs in BC — building, trade, and the approvals that come before them — plus which Lower Mainland cities publish a review window and which do not.
10 min read
Leases & Planning
Base building vs tenant improvement
Where the landlord's base building scope ends and your tenant improvement begins — and why the boundary decides your budget.
7 min read
Questions
Frequently asked.
Which North Vancouver municipality reviews my drawings?
Whichever one the address sits in. The City of North Vancouver covers Lower and Central Lonsdale, while the District covers Edgemont, Lynn Valley, Deep Cove and Seymour. Each runs its own building department and its own Commercial Tenant Improvement permit type, so the mailing city on a lease settles nothing.
Do you do commercial tenant improvements in North Vancouver?
Yes. The District requires an architect on most tenant improvements under the Architects Act, exempting work that is only mechanical, electrical or structural. Vancouver Coastal Health is the health authority here rather than Fraser Health, and for childcare, food handling or personal service uses its approval is needed before the building permit application.
Who issues the building permit in North Vancouver?
City of North Vancouver Planning & Development, or the District of North Vancouver Building Department issues it, reviewed against the BC Building Code and the city's own zoning. Both North Vancouver municipalities run Commercial Tenant Improvement as its own building permit type, and the address decides which of the two reviews the drawings.
How long does a commercial permit take in North Vancouver?
North Vancouver does not publish a commercial review window, so we confirm the current one with the city at application rather than quoting a figure from a previous job. Budget 6 to 16 weeks for permits and 10 to 16 weeks on site for a 2,500 sq ft fit-out.
What does commercial construction cost in North Vancouver?
Commercial construction runs $120–$220 per sq ft in 2026, and that band is the same across every city we work in. North Vancouver prices at the top of the band and the reason is access rather than trades. Two bridges gate every delivery and inspection, and North Shore lots are steep and short of staging room. An architect required by statute on most tenant improvements is a real line in the soft costs too.
What makes building in North Vancouver different?
The District of North Vancouver requires an architect for most tenant improvements under the Architects Act, exempting only work that is purely mechanical, electrical or structural. It also points applicants at Bylaw 8271 sections 12.28 to 12.34 before they design anything, because a change of use or a significant alteration can require the entire building to be sprinklered rather than just the suite.
Does Oberizon work in North Vancouver?
Yes, from the White Rock office, across North Vancouver and the North Shore. The North Shore is served from the White Rock office, to the same standards as the clinics and offices we build across the region.
Planning a commercial build in North Vancouver?
Before you sign a lease, commit to drawings or set an opening date, book a consultation and we will tell you what has to be planned before construction starts.