Oberizon Construction

White Rock · Serving the Lower Mainland

Healthcare & Commercial Construction Specialists in BC.

Medical, dental, physio, chiro, optometry, veterinary and pharmacy clinics, plus commercial interiors.

(604) 385-3770
  • BC-licensed general contractor
  • Fully insured, WorkSafeBC registered
  • Planning before construction
Building across the Lower Mainland since 2021
5+yearsBuilding across the Lower Mainland since 2021
35 delivered, 5 in progress
40+projects35 delivered, 5 in progress
Served from the White Rock office
14citiesServed from the White Rock office
Fastest delivered clinic, five operatories
90daysFastest delivered clinic, five operatories

What we build

Healthcare, commercial and luxury residential.

Healthcare is the specialism. Commercial is the volume. Both run through the same team, from first review to handover.

Opening or moving a clinic? Start with medical clinic construction, medical clinic construction in Vancouver, medical clinic construction in Surrey, physiotherapy clinic construction, healthcare construction contractor, medical clinic fit-out, dental clinic renovation or dental office construction companies. Clinic launch incentives sit on the healthcare page.

The Difference

Why owners choose Oberizon.

Because the build has to be managed before the site gets busy — review, scope, services, sequencing and handover, run by one team.

01Planning Before Construction

We review the space, layout, services, permits, budget, and timeline before work starts.

02One Accountable Team

Permits, trades, construction, inspections, and handover managed through one process.

03Built Around Operations

How the space will actually work for patients, staff, customers, and daily use.

04Clear Scope & Budget

Clear scope, clear budget, clear timeline, and fewer surprises.

05Senior Oversight

Oberizon stays involved in planning, sequencing, and execution.

Oberizon clinic planning detail 1
Oberizon clinic planning detail 2
Oberizon clinic planning detail 3
Oberizon clinic planning detail 4

Four steps, one accountable team

01

Review

We walk the space and price the risk before you commit to anything.

02

Plan

Drawings and permits go in while equipment and long-lead items are ordered.

03

Build

One site lead holds the trades and calls you with progress every week.

04

Handover

Inspections cleared and the deficiency list closed before you take the keys.

90-day dental clinic case study
90Days

Featured Case Study

Built in 90 days.

From property to fully functioning dental clinic.

One of our dental clinic projects was completed in 90 days because the planning was handled before construction became chaotic.

The layout was clear. Operatories were mapped. Plumbing and electrical were coordinated. Millwork was measured. Equipment locations were planned. Trades knew the sequence.

Recent Work

Selected Projects.

Healthcare, Commercial, And Residential Projects Across The Lower Mainland.

The Shine Dental, White Rock

Healthcare

The Shine Dental, White Rock

Dental clinic construction with operatory, sterilization, and workflow coordination.

Skinholic Aesthetics, Abbotsford

Med Spa

Skinholic Aesthetics, Abbotsford

Medical spa interior built around client experience, treatment flow, and finish detail.

Dental Clinic, 104 33069 Marshall Road Abbotsford

Healthcare

Dental Clinic, 104 33069 Marshall Road Abbotsford

Dental clinic build-out with clinical service coordination and clean handover.

Luxury Residential

Residential

Luxury Residential

Custom residential construction with high-end finish planning and project control.

Private Office, White Rock

Commercial

Private Office, White Rock

Commercial office interior built for professional use and daily operation.

Client Success

What Clinic Owners Say

Real feedback from healthcare professionals who trusted us with their vision.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.

Dr. Kanwar

Clinic Owner

We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.

Dr. Satpreet

Clinic Owner

Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.

Dr. Bradley

Clinic Owner, Richmond

Service Areas

Construction Services Across TheLower Mainland

Oberizon Construction manages healthcare, commercial, and luxury residential projects across the Lower Mainland.

HQ White Rock

Centrally located to manage projects from West Vancouver to Chilliwack with senior oversight.

Frequently Asked

What Owners Ask Us.

Answers to the most common questions about healthcare, dental, medical, and pharmacy construction in British Columbia.

What is healthcare construction?

Build-outs for clinical spaces — dental, medical, pharmacy, physiotherapy, chiropractic, optometry and veterinary — governed by CSA Z8000 and IPAC infection-control barriers, not standard commercial code alone. Exam rooms, treatment rooms and sterilization are planned before construction begins.

How long does it take to build a dental clinic?

Typically 90–120 days from permit to handover for a standard operatory fit-out. Oberizon's fastest delivered project — a full clinic with five operatories — took exactly 90 days, because equipment and services were coordinated before demolition started.

What permits are required for a medical clinic in BC?

Expect a building permit, mechanical and electrical trade permits, and an accessibility review under the BC Building Code. Fraser Health sign-off is typically required before occupancy, and strata or landlord approval is needed on most tenant improvements.

What is the cost of building a pharmacy in British Columbia?

$180–$250 per square foot for a standard BC pharmacy build-out. A 1,500 sq ft pharmacy typically runs $270,000–$375,000, before dispensary security glazing and USP 795/797 compounding-room pressure cascades.

What should you look for in a healthcare construction contractor?

Ask for three things: clinics actually delivered with addresses you can verify, a written per-square-foot range rather than 'it depends', and the name of the person who will run your site from permit to handover. Oberizon has built healthcare and commercial projects across the Lower Mainland since 2021.

Book a Consultation

Planning a clinic, commercial space, or luxury home? Book a consultation.

Before you commit to a space, drawings, budget, or construction timeline, let Oberizon review the project and help you understand what needs to be planned before construction starts.

WhatsAppCall